Liggett Vector Brands

For major manufacturing enterprises, unplanned downtime and line stoppage can lead to a considerable loss in production capacity. What if these enterprises could discover the factors that could maximize production across the manufacturing floor? With BLDG25 Informed Insights, they can.

Liggett Vector Brands

For major manufacturing enterprises, unplanned downtime and line stoppage can lead to a considerable loss in production capacity. What if these enterprises could discover the factors that could maximize production across the manufacturing floor? With BLDG25 Informed Insights, they can.

HIGHLIGHTS

Optimized Overall Equipment Effectiveness (OEE)
Eliminated 60.5% of unplanned downtime
Delivered in 4 Weeks utilizing existing data flows

WHAT WE DID

Problem


Liggett Vector Brands was experiencing frequent unplanned downtime and line stoppage despite best-in-class maintenance and control systems. Enter BLDG25.

Solution


Using predictive analytics, BLDG25 used existing data to identify ways that Liggett Vector Brands could reduce downtime and maximize mean-time-between-failure (MTBF) to increase throughput of a production line on their manufacturing floor.

SCROLL

The Results


We found that dynamically synchronizing machine speeds across a production line maximized mean-time-between-failure (MTBF), eliminating 60.5% of unplanned downtime and optimizing Overall Equipment Effectiveness (OEE).

Informed Insights provides real-time Maker and Packer optimal speed predictions with visibility into the anticipated effect of each potential change.

  • Failure probability (Risk to Process) of implementing new speed
  • Projected increased production potential 
  • Target OEE given real-time line and shift conditions 
NEXT PROJECT